SEC PageSecurities and Exchange Commission document Appleton Papers Inc. SEC
filings
"West Carrollton Mill "
"The West Carrollton mill, which Appleton purchased in 1984, operates pursuant to various state and federal permits for discharges and emissions to air and water. As a result of the de-inking of carbonless paper containing PCBs through the early 1970s, there have been releases of PCBs and volatile organic compounds into the soil in the area of the wastewater impoundments at the West Carrollton facility and low levels of PCBs have been detected in groundwater immediately under this area. In addition, PCB contamination is present in sediment in the adjacent Great Miami River, but it is believed that this contamination is from a source other than the West Carrollton mill.
Based on investigation and delineation of PCB contamination in soil and groundwater in the area of the wastewater impoundments, Appleton believes that it could be necessary to undertake remedial action in the future, although Appleton is currently under no obligation to do so. Appleton has not had any discussions or communications with any federal, state or local agencies or authorities regarding remedial action to address PCB contamination at the West Carrollton mill. Remedial action to address PCB contamination in the area of the wastewater impoundments is expected to involve construction of a cap to prevent exposure to PCBs. In addition, remedial action could involve long-term monitoring of groundwater or the construction and operation of a groundwater pump-and-treat system to prevent migration of PCB contamination in groundwater, and the removal and disposal of PCB-contaminated sediment, including sediment in the Great Miami River. The cost for remedial action–including installation of a cap, long-term pumping, treating and/or monitoring of groundwater and removal of sediment in the Great Miami River–was estimated in 2001 to range up to approximately $10.5 million, with approximately $3 million in short-term costs and the remainder to be incurred over a period of 30 years. However, costs could exceed this amount if additional contamination is discovered, if additional remedial action is necessary or if the remedial action costs are more than expected.
In addition, in April 2005, eleven local residents who allegedly live (or have lived) near the wastewater treatment plant of the mill and two former mill employees (and one of their spouses) filed lawsuits in Montgomery County, Ohio court alleging that Appleton released and continues to release hazardous substances from the mill, including PCBs, dioxins and fluorochemicals, which allegedly caused injury to the plaintiffs and/or damage to their property. The lawsuits have been removed to the United States District Court for the Southern District of Ohio. The local resident plaintiffs have requested that the court certify the matter as a class action. The plaintiffs request compensatory and punitive damages, remediation and other relief. The lawsuit commenced by the two former mill employees has been dismissed without prejudice. The claims of the other plaintiffs remain pending.
Because of the uncertainty surrounding the ultimate course of action for the West Carrollton mill property, the Great Miami River remediation, and Appleton’s share of these remediation costs, if any, no provision has been recorded in the accompanying financial statements for estimated remediation costs. In conjunction with the acquisition of the Company by the ESOP in 2001, AWA agreed to indemnify the Company for certain environmental liabilities. In addition, the former owner and operator of the West Carrollton mill, under the terms of the acquisition documents related to Appleton’s purchase of the mill, agreed to indemnify Appleton for liabilities relating to the former owner’s ownership of the mill. The Company intends to pursue any rights to indemnification or other recovery it may have for remediation or other liabilities relating to the above-described matters. Other than the PCB contamination in the area of the wastewater impoundments, there are no other known material liabilities with respect to environmental issues at the West Carrollton mill."
Appleton Papers Inc. Complete Report Appleton Papers Inc. Another Report Litigation F-92 to F-94 A portion is listed below "Litigation
On November 25, 1996, a class action was brought against the company in federal district court in Chicago, Illinois, on behalf of current and former African-American employees, alleging that the company racially discriminated against them in violation of the Civil Rights Act of 1871, as amended, and the U.S. Constitution (Jones, et al. v. R.R. Donnelley & Sons Co.). The complaint seeks declaratory and injunctive relief, and asks for actual, compensatory, consequential and punitive damages in an amount not less than $500 million. Although plaintiffs sought nationwide class certification, most of the specific factual assertions of the complaint relate to the closing by the company of its Chicago catalog operations in 1993. Other general claims brought by certain named individuals relate to other company locations.
On June 30, 1998, a class action was filed against the company in federal district court in Chicago on behalf of current and former African-American employees, alleging that the company racially discriminated against them in violation of Title VII of the Civil Rights Act of 1964 (Adams, et al. v. R.R. Donnelley & Sons Co.). While making many of the same general discrimination claims contained in the Jones complaint, the Adams plaintiffs also claim retaliation by the company for the filing of discrimination charges or otherwise complaining of race discrimination.
On April 6, 2001, in an amended opinion, the district court judge in the Jones and Adams cases certified three plaintiff classes in the actions: a class consisting of African-American employees discharged in connection with the shutdown of the Chicago catalog operations; a class consisting of African-American employees of the Chicago catalog operations after November 1992 who were other than permanent employees; and a class consisting of African-Americans subjected to an allegedly hostile working environment at the Chicago catalog operations, the Chicago Financial, Pontiac or Dwight, Illinois, manufacturing operations. The judge also consolidated the Jones and Adams cases for pretrial purposes.
In a decision issued September 16, 2002, the Seventh Circuit Court of Appeals overturned a ruling by the trial court and held that a two year statute of limitations applies to the claims filed under Section 1981 of the Civil Rights Act. The court of appeals remanded the case for further proceedings consistent with its opinion, and on November 21, 2002, the court of appeals denied plaintiffs’ petition for rehearing. Absent the trial court’s adoption of plaintiffs’ theories tolling the statute of limitations, the ruling of the court of appeals, unless released on appeal, will bar the claims of the classes in the Jones case.
On December 18, 1995, a class action was filed against the company in federal district court in Chicago alleging that older workers were discriminated against in selection for termination upon the closing of the "
F-92 Appleton Papers Inc SEC reports 2005 and past reports http://www.sec.gov/cgi-bin/browse-edgar?filenum=333-82084&action=getcompany Includes West Carrollton Ohio Appleton Papers Inc.'s facility manufacturing carbonless copy paper, recycling mill and owned waste treatment facility. All are built over an aquifer supplying water to hundreds of homes. Appleton discharges into the local river.
UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-Q
APPLETON PAPERS INC. PAPERWEIGHT
DEVELOPMENT CORP
Appleton Papers Inc. 4-05 Submission
PAPERWEIGHT DEVELOPMENT CORP. AND SUBSIDIARIES
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS – (Continued)
West Carrollton Mill
The West Carrollton mill, which Appleton purchased in 1984, operates pursuant to various state and federal permits for discharges and emissions to air and water. As a result of the de-inking of carbonless paper containing PCBs through the early 1970s, there have been releases of PCBs and volatile organic compounds into the soil in the area of the wastewater impoundments at the West Carrollton facility and low levels of PCBs have been detected in groundwater immediately under this area. In addition, PCB contamination is present in sediment in the adjacent Great Miami River, but it is believed that this contamination is from a source other than the West Carrollton mill.
Based on investigation and delineation of PCB contamination in soil and groundwater in the area of the wastewater impoundments, Appleton believes that it could be necessary to undertake remedial action in the future, although Appleton is currently under no obligation to do so. Appleton has not had any discussions or communications with any federal, state or local agencies or authorities regarding remedial action to address PCB contamination at the West Carrollton mill. Remedial action to address PCB contamination in the area of the wastewater impoundments is expected to involve construction of a cap to prevent exposure to PCBs. In addition, remedial action could involve long-term monitoring of groundwater or the construction and operation of a groundwater pump-and-treat system to prevent migration of PCB contamination in groundwater, and the removal and disposal of PCB-contaminated sediment in the Great Miami River. The cost for remedial action–including installation of a cap, long-term pumping, treating and/or monitoring of groundwater and removal of sediment in the Great Miami River–is estimated to range up to approximately $10.5 million, with approximately $3 million in short-term costs and the remainder to be incurred over a period of 30 years. However, costs could exceed this amount if additional contamination is discovered, if additional remedial action is necessary or if the remedial action costs are more than expected. In addition, in April 2005, eleven local residents who allegedly live (or have lived) near the wastewater treatment plant of the mill and **two former mill employees (and one of their spouses) have filed lawsuits in Montgomery County, Ohio court alleging that Appleton has released and continues to release hazardous substances from the mill, including PCBs, dioxins and fluorochemicals, which allegedly caused injury to the plaintiffs and/or damage to their property. The lawsuit involving the local residents has been removed to the United States District Court for the Southern District of Ohio. The local resident plaintiffs have requested that the court certify the matter as a class action. The plaintiffs request compensatory and punitive damages, remediation and other relief. The Company intends to vigorously defend itself against these matters.
Because of the uncertainty surrounding the ultimate course of action for the West Carrollton mill property, the Great Miami River remediation, and Appleton’s share of these remediation costs, if any, no provision has been recorded in the accompanying financial statements for estimated remediation costs. In conjunction with the acquisition of the Company by the ESOP in 2001, AWA agreed to indemnify the Company for 50% of all environmental liabilities at the West Carrollton mill up to $5.0 million and 100% of all such environmental costs exceeding $5.0 million. In addition, the former owner and operator of the West Carrollton mill, under the terms of the acquisition documents related to Appleton’s purchase of the mill, agreed to indemnify Appleton for liabilities relating to the former owner’s ownership of the mill. The Company intends to pursue any rights to indemnification or other recovery it may have for remediation or other liabilities relating to the above-described matters. Other than the PCB contamination in the area of the wastewater impoundments, there are no other known material liabilities with respect to environmental issues at the West Carrollton mill.
** Diane Schramm & Stuart Bessette worked at Appleton Papers Inc.'s West Carrollton Ohio plant
17
Appleton Papers Inc. 2002
Another Appleton Papers Inc. SEC document
"Company Background"
"Appleton Coated Paper Company, or ACPC, began operations in 1907 in what is now our Appleton plant. In 1953, ACPC began working with National Cash Register Company, which later changed its name to NCR Corporation, on the development and production of carbonless paper. In 1954, NCR began marketing its NCR Paper(R) brand of carbonless paper, which ACPC manufactured. In 1969, NCR acquired Combined Paper Mills, Inc., which then consisted of pulp and paper mills in Combined Locks, Wisconsin and Roaring Spring, Pennsylvania. In 1970, NCR acquired ACPC. The Appleton Papers division of NCR was formed through the merger of ACPC with Combined Paper Mills, Inc. In 1978, Appleton Papers Inc., as a subsidiary of BAT Industries Inc., acquired the assets of the Appleton Papers division from NCR. In 1990, we, together with The Wiggins Teape Group Ltd., were separated from BAT Industries to form Wiggins Teape Appleton plc, a public company listed on the London Stock Exchange. Later that same year, Wiggins Teape Appleton merged with Arjomari Prioux SA, a public French paper manufacturer and merchant. Arjomari retained its listing in Paris and, upon completion of the merger, Arjomari owned 39% of Wiggins Teape Appleton. Shortly after the merger, the group changed its name to Arjo Wiggins Appleton p.l.c. Prior to the acquisition, we were an indirect, wholly owned subsidiary of Arjo Wiggins Appleton p.l.c., which is now known as Arjo Wiggins Appleton Limited or AWA, a leading European manufacturer of paper products." SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549
Commission file number: 333-82084 APPLETON PAPERS INC. (Exact name of registrant as specified in its charter)
Registrant’s telephone number, including area code: (920) 734-9841 12. COMMITMENTS AND CONTINGENCIES
Lower Fox River
Various state and federal government agencies and Native American tribes have asserted claims against Appleton and other parties with respect to historic discharges of polychlorinated biphenyls (“PCBs”) into the Lower Fox River in Wisconsin.
Carbonless paper containing PCBs was manufactured at what is currently the Appleton plant from 1954 until 1971. Wastewater from the Appleton plant, the Combined Locks paper mill now owned by Appleton Coated LLC (which is owned by AWA’s ultimate parent) and from other local industrial facilities carried PCBs into the Lower Fox River during this time period. As a result, there are allegedly eleven million cubic yards of PCB-contaminated sediment spread over 39 miles of the Lower Fox River. Low levels of PCBs have also been washed by the Lower Fox River into Green Bay, which is part of Lake Michigan. In June 1997, the EPA published notice that it intended to list the Lower Fox River on the National Priorities List of Contaminated Sites pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA” or “Superfund”). The EPA identified seven potentially responsible parties (“PRPs”) for PCB contamination in the Lower Fox River, including NCR Corporation (“NCR”) and Appleton as the former and current owners and operators of the Appleton plant, and the owners of five paper reprocessing mills located on the Fox River, including Georgia-Pacific, P.H. Glatfelter Company, WTM I Co., owned by Chesapeake Corporation, Riverside Paper Corporation and U.S. Paper Mills Corp., which is now owned by Sonoco Products Company.
On January 7, 2003, the Wisconsin Department of Natural Resources (“DNR”) issued a Record of Decision (“ROD”), with which the United States Environmental Protection Agency (“EPA”) concurred, on the first two segments of the river, which are largely upstream of the Appleton plant. The ROD provides for dredging in the first segment and monitored natural recovery in the second segment. However, the ROD also provides that up to 25% of the remedy in the first segment may consist of capping if dredging proves not to be cost-effective and certain conditions are met. It is Appleton’s position that neither Appleton nor NCR has any responsibility or liability for PCB contamination in the first segment of the Lower Fox River. On July 28, 2003, the DNR and EPA issued a ROD covering the third, fourth and fifth segments of the Lower Fox River (which includes Green Bay) which also provides for substantial dredging in that portion of the river.
In the two RODs, the DNR estimates total costs for the Lower Fox River remedial action plan of approximately $400 million, an increase of $67 million over prior estimates, over a 7 to 18 year time period. Most of the estimated costs relate to the removal of large quantities of sediment from the Lower Fox River by dredging, dewatering of the dredged materials, treatment of the dredge water and off-site disposal of the remaining solids. Based on cost estimates of large-scale dredging response actions at other sites and many subjective assumptions regarding the work to be done, engineers engaged by several of the PRPs have estimated that the cost of remediation work in the Lower Fox River could be between $740 million and $1.6 billion. The DNR strongly disputes this analysis and continues to believe that its cost estimates are accurate.
Appleton does not believe that the remedial action proposed by the DNR in the two RODs is appropriate or cost-effective. Appleton, along with the other PRPs, has developed a substantial body of evidence that Appleton believes demonstrates that selection of alternatives involving active, river-wide remediation, particularly massive dredging, would be inappropriate and unnecessary. There is ongoing vigorous debate within the scientific, regulatory, legal, public policy and legislative communities over how to properly manage contaminated sediments. Although Appleton believes that the remedy adopted in the RODs is inappropriate and may be substantially modified and improved over time through further design and experience, the issuance of the RODs greatly reduces the uncertainty about the remedy that will be implemented in the Lower Fox River.
In October 2000, the U.S. Fish and Wildlife Service (“FWS”) released a proposed restoration and compensation determination plan presenting the federal and tribal natural resource trustees’ planned approach for restoring natural resources injured by PCBs and calculating the potential natural resource damages (“NRDs”) under different remedial action scenarios. The final NRD valuation will depend on the extent of PCB cleanup; however, the proposed plan estimates that NRDs will fall in the range of $176 million to $333 million for all PRPs in the aggregate. The total costs estimated by the DNR, EPA and FWS for the proposed remediation and NRD discussed above range from $576 million to $733 million. Over the past several years and at various natural resource damage sites, the FWS and other government agencies have settled NRD claims for amounts substantially less than original estimates or claims. In June 2002, the state and federal trustees announced a proposed settlement of their NRD claims against Fort James Operating Company, a subsidiary of Georgia-Pacific Corporation (“Fort James”), the owner of one of the reprocessing mills. Under the settlement, Fort James would pay for or conduct restoration projects with a total cost of approximately $12 million. The proposed settlement
was challenged by an environmental group in a case brought before the U.S. District Court in Milwaukee. On March 19, 2004, the U.S. District Court rejected the challenge and granted the state and federal trustees’ motion to enter the consent decree. Appleton anticipates the actual costs for the PRPs to settle NRD claims related to the Lower Fox River to be significantly less than the initial range of $176 million to $333 million.
Appleton purchased the Appleton plant from NCR in 1978, after the use of PCBs in the manufacturing process was discontinued. Nevertheless, pursuant to CERCLA, both Appleton and NCR are viewed by the EPA as PRPs. Accordingly, Appleton and NCR asserted indemnity claims against each other pursuant to the terms of the agreement for the purchase of the assets of the business in 1978. In order to resolve indemnification obligations to each other, Appleton entered into an interim settlement agreement with NCR in 1998 under which the parties agreed to share both defense and liability costs arising from the Lower Fox River.
A study performed by the FWS in 2000 provided a preliminary estimate of the amount of PCBs discharged into the Lower Fox River by each PRP and concluded that the discharges from the Appleton plant and the Combined Locks paper mill (which Appleton formerly owned and which is now owned by an affiliate of AWA) represented a percentage in the range of 36% to 52% of the total PCBs discharged. These preliminary estimates have not yet been finalized by the FWS and may be revised. The FWS analysis will not be binding on the PRPs. The final allocation of liability among the PRPs will be determined by negotiation, litigation or other dispute resolution process. Based on historical and technical analyses performed by environmental engineers Appleton has engaged, Appleton believes that the percentage of PCBs discharged from the Appleton and Combined Locks facilities is less than 20% of the total discharged by all the PRPs. A portion of Appleton’s potential liability for the Lower Fox River may be joint and several. If, in the future, one or more of the other PRPs were to become insolvent or unable to pay their respective share(s) of the potential liability, Appleton could be responsible for a portion of their share(s). Based on a review of publicly available financial information about the other PRPs, Appleton believes that the other PRPs will be required, and have adequate financial resources, to pay their share of the remediation and natural resource damage claims for the Lower Fox River.
Appleton entered into a consent decree on December 10, 2001 with NCR, the DNR, the Wisconsin Department of Justice, the EPA, the FWS, the U.S. Department of Justice, the National Oceanic and Atmospheric Administration, and the Oneida and Menomonee Indian Tribes which are collectively referred to as the intergovernmental partners, or IGP. Pursuant to the consent decree, Appleton and NCR agreed to provide up to $41.5 million over a period of four years, to a maximum of $10.4 million per year, for interim restoration and remediation efforts directed by the IGP. Appleton and NCR will each pay approximately half of the amounts paid under the consent decree. Through the first half of 2004, Appleton has paid approximately $8.4 million under the consent decree. Under the consent decree, the IGP agree not to sue or take administrative action against Appleton and NCR during the four-year period including pursuant to any claims that could be made as a result of the issuance of the ROD. The consent decree does not constitute a final settlement with the IGP or provide protection against future claims against Appleton and NCR; however, under the decree, Appleton and NCR will receive full credit against remediation costs and NRD claims for all monies expended for restoration and remediation of the Lower Fox River during the interim period including pursuant to any claims that could be made as a result of the issuance of the RODs. Appleton recorded a charge of $19.2 million for its discounted share of the arrangement during the first quarter of 2001. At July 4, 2004 this liability approximated $14.0 million.
A precise estimate of Appleton’s ultimate share of remediation and natural resource damage liability cannot be made at this time due to uncertainties with respect to: the scope and cost of implementing the final remediation plan; the scope of restoration and final valuation of federal and state NRD assessments; the evolving nature of remediation and restoration technologies and governmental policies; and Appleton’s share of remediation and NRD costs relative to the other PRPs. However, the issuance of the RODs greatly reduces the uncertainty about the remedy that will be implemented in the Lower Fox River and provides Appleton the ability to reasonably estimate its potential liability. Accordingly, Appleton has recorded a reserve for this environmental liability. At January 3, 2004 this reserve approximated $109.1 million. During the first half of 2004, the total reserve was accreted by $3.5 million while payments against the reserve totaled $3.4 million. This resulted in a remaining reserve of $109.2 million as of July 4, 2004, of which $9.8 million is recorded in other accrued liabilities and $99.4 million is recorded as an environmental liability.
As part of the November 9, 2001 acquisition, AWA agreed to indemnify Appleton for the first $75 million and for all amounts over $100 million in liabilities relating to the Lower Fox River (see Note 2 “Acquisition of Businesses”). At July 4, 2004, the total indemnification receivable from AWA is $86.2 million, of which, $9.8 million is recorded in other current assets and $76.4 million is recorded as an environmental indemnification receivable. The $23.0 million difference between the reserve and the indemnification receivable represents the discounted share of Lower Fox River costs for which Appleton is responsible. The $21.0 million charge was recorded against earnings in 2002 and has accreted to $23.0 million through the first half of 2004. This discounted share was calculated using a discount rate of 6.0%, which represents Appleton’s estimate of the fair market interest rate at which this liability could be settled in an arm’s length transaction. This $21.0 million amount will accrete to $25.0 million by the end of 2005.
A summary of the indemnification receivable/environmental liability is below (dollars in thousands): ...........
Appleton used the estimates described below, including the most recent government agency estimates, in evaluating its Lower Fox River environmental liability: (1) total costs for remediation of $480 million, based on the DNR’s estimate of $400 million in total costs for remediation, plus a 20% contingency; (2) the FWS preliminary estimate that discharges from the Appleton plant and the Combined Locks mill represent 36% to 52% of the total PCBs discharged by the PRPs, which is substantially greater than Appleton’s estimate (Appleton assumes that Appleton and NCR are primarily responsible for only the discharges from the Appleton and Combined Locks facilities and not for other discharges.); (3) costs to settle NRD claims against Appleton and NCR, estimated at $20 million or less, based on the IGP’s $12 million settlement of NRD claims against Fort James; (4) Appleton’s responsibility for about half of the claims asserted against Appleton and NCR, based on the interim settlement agreement with NCR, the terms of which are confidential; and (5) $20 million in fees and expenses. Because of the numerous uncertainties underlying these estimates, it is possible that Appleton’s share of costs could be higher.
West Carrollton Mill
The West Carrollton mill operates pursuant to various state and federal permits for discharges and emissions to air and water. As a result of the de-inking of carbonless paper containing PCBs through the early 1970s, there have been releases of PCBs and volatile organic compounds into the soil in the area of the wastewater impoundments at the West Carrollton facility and low levels of PCBs have been detected in groundwater immediately under this area. In addition, PCB contamination is present in sediment in the adjacent Great Miami River, but it is believed that this contamination is from a source other than the West Carrollton mill.
Based on investigation and delineation of PCB contamination in soil and groundwater in the area of the wastewater impoundments, Appleton believes that it could be necessary to undertake remedial action in the future, although Appleton is currently under no obligation to do so. Appleton has not had any discussions or communications with any federal, state or local agencies or authorities regarding remedial action to address PCB contamination at the West Carrollton mill. Remedial action to address PCB contamination in the area of the wastewater impoundments is expected to involve construction of a cap to prevent exposure to PCBs. In addition, remedial action could involve long-term monitoring of groundwater or the construction and operation of a groundwater pump-and-treat system to prevent migration of PCB contamination in groundwater, and the removal and disposal of PCB-contaminated sediment in the Great Miami River. The cost for remedial action—including installation of a cap, long-term pumping, treating and/or monitoring of groundwater and removal of sediment in the Great Miami River—is estimated to range up to approximately $10.5 million, with approximately $3 million in short-term capital costs and the remainder to be incurred over a period of 30 years. However, costs could exceed this amount if additional contamination is discovered, if additional remedial action is necessary or if the remedial action costs are more than expected.
Because of the uncertainty surrounding the ultimate course of action for the West Carrollton mill, the Great Miami River remediation and Appleton’s share of these remediation costs, if any, no provision has been recorded in the accompanying financial statements for estimated remediation costs. In conjunction with the acquisition of the Company in 2001, AWA agreed to indemnify the Company for 50% of all environmental liabilities up to $5.0 million and 100% of all such environmental costs exceeding $5.0 million. In addition, the former owner and operator of the West Carrollton mill may be liable for all or part of the cost of remediation of historic PCB contamination. Other than the PCB contamination in the area of the wastewater impoundments, there are no other known material liabilities with respect to environmental issues at the West Carrollton mill.
Other
From time to time, Appleton may be involved in product liability and various other suits incident to the operation of its business. A comprehensive insurance program is maintained and estimated costs are recorded for claims and suits of this nature. It is management’s opinion that none of these claims or suits will have a materially adverse effect on the Company’s financial position, results of operations or cash flows.
|